BYD Shenzhen factory visit
Check whether an invitation covers a headquarters, showroom or production line.
PROPOSED ITINERARY
Spend day one in Huaqiangbei and request one or two visits to relevant PCB, SMT or injection molding factories in Shenzhen or Dongguan, with interpretation.
Day one is for samples and quotes in Huaqiangbei. Day two is for one or two host-confirmed supplier appointments in Shenzhen or Dongguan. Select PCB fabrication, SMT assembly or molding based on a production question in your brief.
Check factory access · Choose questions by process · Plan for an access change
Compare components and samples and turn what you learn into questions for suppliers.
Request one or two relevant PCB fabrication, SMT assembly or injection molding visits. Confirm site permission and travel time before committing.
Compare lead times, tooling, quality checks and the evidence each supplier can provide.
Before travel, confirm the production address, host, process you can observe, photo permissions and whether the visit includes a technical conversation. If production access is unavailable, agree on an alternative before booking.
Sample purchases, transport, accommodation and any third-party fees are quoted separately. Dates and access are subject to confirmation.
Use a public showroom when your objective is to see devices and compare user experiences. It can help with benchmarking, but it will rarely answer questions about line controls, throughput or quality records. Check current public access and whether a product demonstration needs an appointment.
Request a supplier visit if you have a non-confidential product brief and want to understand how a manufacturer might build it. Ask in advance who will take you through the process and whether you can see the relevant operation, a production record or a sample from a comparable job. Available processes and dates depend on the host.
Use an appropriate independent specialist when a contract requires a formal audit, regulatory verification or independently sampled inspection. Define the applicable standard, sampling method and report in a separate scope. A guided walkthrough can help frame questions for that audit.
If you are looking for a visit to BYD, DJI or another named manufacturer, check which visitor experience the organization actually confirms. A retail demo, exhibition, headquarters tour and production-line visit are different activities. This proposed itinerary does not include confirmed access to any named brand. For engineering work, identify the process and decision first, then choose the relevant supplier.
| Before committing | Confirmed enough to proceed | If missing |
|---|---|---|
| Site and host | Production gate address and a named person who can receive your group. | Request the Chinese address and clarification about any separate showroom. |
| Process and relevance | A specific process, suitable example and the engineering or quality person needed for your questions. | Request a technical meeting and agree what documents the supplier can show. |
| Evidence and permissions | Permission for the intended observations or notes and an alternative if the line is unavailable. | Accept a replacement only if it answers the original decision. Record what stays open. |
Try the factory visit worksheet before sending a supplier the agenda. For a specific automotive site, use the BYD access checks.
Choose one question that would change what you do next. Examples include whether a plastics tool can be revised after the first trial, whether a fixture is needed for your functional test, or whether a board supplier can support the required material. Put it at the top of the agenda and ask the supplier to invite the person who owns the answer.
| When | What to cover | Evidence to record |
|---|---|---|
| Before travel | Production address, host, access, language, transport and photo permissions. | Written confirmation and an agreed alternative for access changes. |
| Opening meeting | Introduce the product and establish what will be done on site. | Identify the proposed legal entity and write down who is responsible for each operation. |
| Walkthrough | Follow the relevant workflow from incoming parts or material to the final check. | Record what was observed, what was described and which records can be shared. |
| Technical discussion | Compare process limits, risks, alternate materials and testing. | List unanswered questions and pin down the revision of any drawings discussed. |
| Wrap-up | Agree on the next sample, quote or written response and who owns it. | One responsible person and expected date per item. |
Confirm who manufactures the boards, which proposed stack-up and material they quote and whether your application involves any specific impedance or isolation requirements. Ask about available electrical testing and what evidence can be tied to a lot. Compare tolerances and acceptance criteria against your files and discuss how engineering questions are resolved before panels go into production.
Walk through material intake, assembly, optical inspection and any functional test steps that apply. Ask how the team tracks component revisions and approves substitutes, how rejected units are isolated and which parts of the process stay in-house. Find out what the line check can detect and which faults need a powered functional test at a different station.
Ask who designs, cuts, owns and stores the tool. Discuss draft, parting lines, gate and ejector locations against the surfaces you need to protect. Confirm how trial samples are approved, how materials and colors are controlled and what happens if a tool needs modification after the first run.
Identify the dimensions that drive fit, finish and repeatability. Ask whether machining, coatings and final measurement occur at separate sites. Check what tolerances the quote assumes after finishing, how the supplier plans to hold the part and which features they will measure on the first article.
Ask which test belongs to the component supplier, which is performed by the assembler and which depends on your own fixture or software. Discuss how test records are labeled by lot or serial number where needed. Agree what packing protects the part during storage and transport, and whether protective materials are included in the quote.
Score each supplier on specification fit, ability to support your lot size, clarity about subcontracting, test evidence and communication. Leave unknown fields blank instead of turning a sales claim into a pass. If a factory declined photography but answered a question in writing, record the written answer as a different kind of evidence from a process you actually observed.
For an enclosure pilot, for example, one supplier may take your order at a low minimum but outsource the coating. A second may control the finishing operation but require a larger first run. Compare the risk that matters most: whether the assembled part fits after finishing, whether the supplier can reproduce the color and whether a second round of samples would delay your schedule. Request equivalent first-article measurements before comparing the quotations.
After travel, send a short recap to each supplier. List the drawing revision, open questions, required evidence and next decision. Ask recipients to correct any misunderstanding. Keep this email with the worksheet so newer terms can be compared with the visit notes.
A high-volume line is interesting, but it tells you little about whether the same shop can start with a small pilot. Ask for a discussion of a comparable operation, approximate lot size and required checks. A host may be unable to show a customer's product. An anonymized traveler, blank inspection form or conversation about the sequence can still clarify how your own job would be handled.
Follow what happens after an engineer changes a drawing or an approved component. Identify who updates the work instruction, phase-in timing, old stock disposition and any sign-off. Ask how an operator distinguishes the new version from the old one and what record ties the output to the approved revision.
Ask what happens if the first part fails a fit check. Find out whether the part is held, reworked, returned or evaluated by engineering. Agree whether the supplier would ask you before modifying the process. A process description is useful. For a purchase decision, request the inspection and change arrangements in writing.
An idle machine can show setup, model and physical capacity. It may not prove the process is running for your material, tolerance or quantity. Write down exactly what you saw, what the host described and what your next sample needs to prove. Do not score the gap as a failure unless it represents an unmet requirement for your job.
Send a non-confidential list of the functions that must be checked. During the meeting, walk from programming to functional test and agree which outputs need to be logged. Ask who designs the fixture, who will maintain it and what it costs to update after an engineering change. Shortlist suppliers based on coverage and clarity of responsibility before comparing fixture quotes.
Bring a reference sample showing the target finish. Ask the host to identify surfaces where parting lines, gates, witness marks or uneven coating could appear. Agree how you will judge acceptability and whether the first article will have all of the final finishing steps. In the notes, record the responsible company for any outsourced process.
Check when the clock starts and what must be supplied first. Go through incoming components, quality checks, approvals and any subcontracted operations. Ask which date the factory is willing to confirm and under what conditions it changes. A short time from all-materials-ready to assembly may still leave a long time from the day you order.
It depends on the host and the purpose. A public demo may be a better fit for general exploration. For a supplier visit, a non-confidential use case and a precise process question make it easier to invite the right person and confirm the relevant operation.
A tour is a guided visit with evidence limited by access, timing and host permission. An audit has a separate scope, criteria, sampling method and reporting requirements. Commission any independent audit separately.
Confirm both before travel. Ask about identification, protective clothing, safety instructions and who can enter each area. If photography is restricted, request a written answer, approved handout or verbal walkthrough with permission to take notes.
Confirm an alternate in advance, such as a different supplier, a technical meeting or a rebooked date. Decide whether the alternate can answer your project question before accepting it.
Agree on the fallback before paying the guide fee. Start with the decision, then choose the evidence that could support it. Record the product revision, source and date for anything you receive.
| Decision | Alternative evidence to request | When to postpone the decision |
|---|---|---|
| Will the enclosure fit? | A labeled first article and measurement report tied to the drawing revision. Ask who produced and measured it. | The sample uses a different design, finish or process from the part you are approving. |
| Who controls SMT test? | A technical call and an approved example of the test procedure or anonymized record. Confirm programming, test coverage and how failed units are handled. | You need evidence of actual line execution or the supplier cannot identify the responsible site. |
| Can the factory run our pilot order? | A written pilot plan with capacity assumptions, lot size, outsourced operations and approval gates. | Your contract needs independently verified capacity or a formal audit. Arrange a visit with the appropriate scope. |
Example: if an assembly visit is canceled and the supplier shares a sample test record, mark it as documentary evidence for that process. Mark line execution as unobserved. Schedule a follow-up if you need to see the exact operation before approving production.