Shenzhen rapid prototyping
Choose a process for a fit, function or finish sample and prepare comparable RFQs.
HARDWARE SOURCING GUIDE
Align the revision, test scope and delivery terms, then compare two supplier quotes.
Write the exact stage you want quoted. A board fabricator, assembly shop and full turnkey contractor are not interchangeable on the same scope. Ask each company to identify its in-house processes, equipment or methods relevant to the design and the operations it sends elsewhere. If a distributor quotes the complete job, determine who controls design changes and who owns the production relationship.
Ask for the legal entity on the quote, the name on the payment account and the production location. Where these differ, ask the supplier to explain the responsibilities of each party before agreeing to a payment. Save the company details and quote version with contact names. If your order depends on formal due diligence, engage a qualified provider and define what evidence is needed.
Pick a measurable requirement, such as a panel dimension after finishing or a function that must pass after programming. Ask each proposed supplier how it would verify it and whether it can provide a report matched to your sample. Where testing is outsourced, ask whose record you will receive and how the sample is identified. The response can reveal which seller understands the application and which quote still needs work.
At the end of a visit, assign an owner and deadline to each technical question. Record what can be decided now, what needs a quote and what needs sample testing. Do not allow silence about a drawing note or testing step to become a presumed inclusion. Confirm the change in writing if the supplier moving forward sends a different revision.
Download a hardware RFQ starter template and use the sample log to track quotes.
Imagine a team needs ten engineering units and a hundred pilot units. One supplier quotes a single board price including assembly but excludes programming, a functional test and any fixture. The other separates setup, programming and testing. Ask both to price the same board revision, parts list, quantities and approved alternates. Ask whether supplied parts, locally sourced parts or selected components from an authorized source are assumed.
Then request the same acceptance criteria for both quotes. A visual inspection and a powered functional test answer different questions. For the fixture, ask who owns it, how much it costs to revise and whether it is required for the engineering lot or the pilot. Record whether each supplier performs the work itself and what happens if a component is out of stock.
Compare the quote at each lot size. A setup-heavy quote may be expensive for ten units and affordable for a hundred. Before choosing a pilot supplier, inspect the first unit against your acceptance criteria and agree in writing which failures count as rework, rejection or a design issue.
The numbers below are illustrative USD values for the same part. No supplier quoted them. Suppose Supplier A lists a setup charge of $120 and unit prices of $14 at 10 pieces and $9 at 100 pieces. Supplier B lists $300 setup and $11 at 10 pieces or $7 at 100. Assume both quotes include the same inspection and exclude delivery and taxes.
| Quantity | Supplier A | Supplier B |
|---|---|---|
| 10 samples | $120 + (10 × $14) = $260 | $300 + (10 × $11) = $410 |
| 100 pilot units | $120 + (100 × $9) = $1,020 | $300 + (100 × $7) = $1,000 |
At 10 units A costs less. At 100 units B has a narrow lead before any additional charges. Ask whether setup is a one-time charge, whether the pilot reuses the sample setup and how a drawing change affects the costs. Even a small inspection or packing difference could change the decision. Keep eligibility, evidence and price in separate columns in the quote comparison.
Use this when the revision, currency, included tests and delivery terms match. Enter each supplier’s unit price and all confirmed one-time charges for the quantity you want to compare. Enter zero only if the supplier confirms there is no one-time charge. Run it again at the pilot quantity using the matching unit prices.
The prefilled inputs are illustrative. The comparison uses quantity × unit price + one-time charges. Shipping, tax or testing costs belong in the quote inputs only when both suppliers are compared on the same agreed basis.
Hardware Sample Acceptance · Compare Shenzhen sourcing trips